For example, it can apply to embankment reinforcement and embankment fill and rock slope defence and pavement crack prevention etc.
如在路堤加筋、台背路堤填土加筋、岩石边坡路基防护和路面裂缝的防治等。
Slope construction at upper reach of bedding materials of the concrete face rock-fill dam directly relates to the quality of concrete face, dam construction progress and cost of construction.
面板堆石坝垫层料上游坡面施工直接关系面板的质量、大坝施工进度及施工成本。
应用推荐